Home首页Process流程

How we work我们的工作方式

From enquiry to handover, in ten steps从咨询到交付,十个步骤

The same four steps as the homepage — choose the product, match material to your zone, get a budget range, then confirm — expanded into one accountable flow, with a hard rule before anything goes into production.与首页相同的四个步骤——选择产品、根据您的区域匹配材料、获取预算范围,然后确认——扩展为一个责任明确的完整流程,并在任何东西进入生产之前设有一条硬性规则。

No approved drawing pack.没有已批准图纸包。 No production release.就不放行生产。

In plain terms: we don’t start building until you’ve signed off the final drawings, colours, hardware and quotation.简单来说:在您签署确认最终图纸、颜色、五金和报价之前,我们不会开始制作。

The same four steps, in detail同样的四个步骤,详细说明

Choose the right product, match the material to the Sarawak zone, get a realistic budget range, then confirm through showroom, measurement and approved drawing.选择合适的产品,将材料与砂拉越的区域匹配,获取切合实际的预算范围,再通过展厅、现场测量与已批准图纸确认。 The budget range begins as an early pre-check and firms up once your product and zone are set — below is the full ten-step flow that delivers those four decisions.预算范围一开始作为早期预检,待您的产品和区域确定后便正式敲定——以下是促成这四个决定的完整十步流程。

The ALUMAX modelALUMAX 模式

Designed & engineered by ELS. Built by ALUMAX.由 ELS 设计与工程,由 ALUMAX 建造。

Every product is fully engineered before it is made. ELS by ALUMAX owns everything up to production — the design, the specification and the engineering. ALUMAX executes that specification: sourcing, manufacturing, installing and standing behind it. Nothing is left to on-site guesswork that should have been settled at the drawing board.每件产品在制造之前都已完成完整的工程设计。投产之前的一切——设计、规格与工程——都由 ELS by ALUMAX 负责;ALUMAX 则执行这套规格:采购、制造、安装,并对成品负责到底。凡是本该在图纸上敲定的事,绝不留到现场靠猜。

ELS by ALUMAX

Everything before production生产前的一切
  • Product & system development产品与系统开发cabinet, aluminium & office systems, hardware standards, packages and the Living Design Specifications (LDS)柜体、铝材与办公系统、五金标准、配套方案,以及 Living Design Specifications(LDS)设计规范
  • Interior design室内设计collections, moodboards, styling, space & lighting planning, material matching产品系列、情绪板、风格搭配、空间与灯光规划、材料配搭
  • Engineering工程construction, panel thickness, joints, aluminium profiles, structural feasibility, appliance integration, glass, waterproofing, ventilation, ergonomics and the manufacturing & installation method构造、板材厚度、接合方式、铝型材、结构可行性、电器整合、玻璃、防水、通风、人体工学,以及制造与安装工法
  • Technical specification技术规格material spec, BOM, manufacturing drawings, installation notes, QC requirements and tolerances材料规格、BOM、生产图纸、安装说明、QC 要求与公差

ALUMAX

Executes the specification执行技术规格
  • Supply chain供应链supplier sourcing, purchasing and inventory供应商寻源、采购与库存
  • Manufacturing制造CNC, fabrication, assembly and production schedulingCNC、加工、组装与生产排程
  • Site现场delivery, installation, trade coordination and site logistics运送、安装、工种协调与现场物流
  • Quality assurance品质保证checked against the LDS, not personal judgement以 LDS 为准进行检验,而非凭个人判断
  • Warranty, after-sales, maintenance & service保修、售后、保养与维修服务
Why it matters.为什么这很重要。 Your cabinet’s construction, waterproofing and tolerances are engineered first — not decided on installation day. ALUMAX’s question isn’t “can this be built?” but “how do we build it well, efficiently and to the standard already set?”您柜子的构造、防水与公差,都是先经工程设计——而不是留到安装当天才决定。ALUMAX 问的从来不是“这能不能做?”,而是“如何做得好、做得高效、并达到既定标准?”
1
Enquire咨询Budget Range / WhatsApp预算范围 / WhatsApp
2
Select选择Material, package & quotation材料、配套与报价
3
Approve批准Drawings & production release图纸与生产放行
4
Produce生产Fabricate / order to spec按规格制作 / 下单
5
Install & handover安装与交付Fit, sign-off & warranty安装、签收与保修
Before installation day安装当天之前 make sure your site is ready — finishes, plumbing, electrical, openings and access.请确保工地已准备就绪——饰面、水电、洞口与通道。 See the site-readiness pre-check →查看工地准备预检 →

The full 10 steps完整的 10 个步骤

01

Enquiry / Budget Range Pre-Check咨询 / 预算范围预检

Your part — 您负责的部分 — Share product, location, space type, size, budget level and photos.提供产品、地点、空间类型、尺寸、预算级别与照片。

02

Showroom Consultation展厅咨询

Your part — 您负责的部分 — Visit to see materials and finishes, or consult on WhatsApp.到访查看材料与饰面,或通过 WhatsApp 咨询。

03

Site Measurement现场测量

Your part — 您负责的部分 — Provide site access; we measure to the millimetre.提供现场通道;我们以毫米为单位精确测量。

04

Material & Package Selection材料与配套选择

Your part — 您负责的部分 — Confirm zone-matched material and package level.确认与区域匹配的材料与配套级别。

05

Quotation报价

Your part — 您负责的部分 — Review the itemised quotation and scope.审阅逐项报价与范围。

06

Drawing Approval图纸批准

Your part — 您负责的部分 — Approve drawings, colours, hardware and appliance dimensions.批准图纸、颜色、五金与电器尺寸。

07

Production Release生产放行

Your part — 您负责的部分 — Sign off the approved drawing pack and deposit before production.在生产前签认已批准图纸包并支付订金。

08

Fabrication / Ordering制作 / 下单

Your part — 您负责的部分 — We fabricate or order to the approved specification.我们按已批准的规格制作或下单。

09

Installation安装

Your part — 您负责的部分 — We install; you keep the site ready and accessible.我们负责安装;您保持现场就绪且可进入。

10

Handover & Warranty交付与保修

Your part — 您负责的部分 — Sign off handover to activate the warranty.签认交付以激活保修。

Confirmed before production release生产放行前确认

  • Final measurement confirmed最终测量已确认
  • Material confirmed材料已确认
  • Colour confirmed颜色已确认
  • Hardware confirmed五金已确认
  • Appliance dimensions confirmed电器尺寸已确认
  • Drawing approved图纸已批准
  • Quotation approved报价已批准
  • Deposit received订金已收讫
  • Production release signed生产放行已签认

The go-ahead to build is signed by you and an ALUMAX representative — and an ELS coordinator on managed projects where applicable.开工许可由您和一位 ALUMAX 代表签署——在适用的托管项目中还需 ELS 协调员签署。 Read the full checklist guide →阅读完整的清单指南 →

Changes after approval.批准后的变更。 Once you’ve approved the drawings or quotation, any change is handled through a在您批准图纸或报价后,任何变更都将通过 variation order变更单 — a written change note that updates the price and timeline — so the scope stays clear for both sides.——一份更新价格和时间安排的书面变更说明——来处理,让双方的工作范围保持清晰。

The paper trail书面记录

You get documents, not just promises您得到的是文件,而不仅仅是承诺

Every project is backed by clear records — so scope, price and warranty stay unambiguous from start to handover.每个项目都有清晰的记录作支撑——让工作范围、价格和保修从开始到交付都明确无误。

Material schedule材料清单
Drawing approval checklist图纸批准清单
Production release checklist生产放行清单
Warranty handover form保修交付表
Budget pre-check result预算预检结果

Illustrative previews — the actual documents are issued for your project.示意预览——实际文件将为您的项目出具。

How payment works付款方式

Staged with the work — never all up front按工程进度分期——绝不预先全额付款

Payment is split across the job, so you pay in step with the work — and nothing goes into production until you approve the drawing.款项按工程进度分期支付,您与施工同步付款;在您确认图纸之前,不会进入生产。

50%
On order下单时You accept the quotation to place the order and lock your pricing — production still follows your approved drawing接受报价即下单并锁定价格——生产仍以您确认的图纸为准
30%
On delivery交货时When your finished units arrive on site成品运抵现场时
20%
On installation安装时On completion and handover, when your warranty activates完工交付时,保修同时生效

This is our standard schedule; final amounts and payment details are confirmed on your written quotation. Prices exclude SST.这是我们的标准付款安排;最终金额与付款细节以书面报价为准。价格不含 SST。

Delivery & coverage.送货与服务范围。 We supply and install across the whole of Sarawak. Sibu and nearby are our home ground; outstation projects — for example Kuching, Miri, Bintulu, Sarikei or Kapit — carry a travel charge of 10%, or a minimum of RM2,500 per trip, confirmed in your quotation.我们在砂拉越全州供应与安装。诗巫及周边是我们的主场;外坡工程——例如古晋、美里、民都鲁、泗里街或加帛——加收 10% 或每趟最低 RM2,500 的差旅费,以报价确认为准。
Built with proven hardware.采用久经验证的五金。 Hinges, runners and drawer systems are Blum and HiGOLD — chosen for daily-use durability and smooth soft-close, and specified to the job rather than to whatever is cheapest.铰链、滑轨与抽屉系统采用 Blum 与 HiGOLD——为日常使用的耐用度与顺畅缓冲而选,按工程需求指定,而非以最便宜为准。
Get My Price获取我的价格
Get My Price获取我的价格