How we work我们的工作方式
From enquiry to handover, in ten steps从咨询到交付,十个步骤
The same four steps as the homepage — choose the product, match material to your zone, get a budget range, then confirm — expanded into one accountable flow, with a hard rule before anything goes into production.与首页相同的四个步骤——选择产品、根据您的区域匹配材料、获取预算范围,然后确认——扩展为一个责任明确的完整流程,并在任何东西进入生产之前设有一条硬性规则。
In plain terms: we don’t start building until you’ve signed off the final drawings, colours, hardware and quotation.简单来说:在您签署确认最终图纸、颜色、五金和报价之前,我们不会开始制作。
The same four steps, in detail同样的四个步骤,详细说明
Choose the right product, match the material to the Sarawak zone, get a realistic budget range, then confirm through showroom, measurement and approved drawing.选择合适的产品,将材料与砂拉越的区域匹配,获取切合实际的预算范围,再通过展厅、现场测量与已批准图纸确认。 The budget range begins as an early pre-check and firms up once your product and zone are set — below is the full ten-step flow that delivers those four decisions.预算范围一开始作为早期预检,待您的产品和区域确定后便正式敲定——以下是促成这四个决定的完整十步流程。
The full 10 steps完整的 10 个步骤
Enquiry / Budget Range Pre-Check咨询 / 预算范围预检
Your part — 您负责的部分 — Share product, location, space type, size, budget level and photos.提供产品、地点、空间类型、尺寸、预算级别与照片。
Showroom Consultation展厅咨询
Your part — 您负责的部分 — Visit to see materials and finishes, or consult on WhatsApp.到访查看材料与饰面,或通过 WhatsApp 咨询。
Site Measurement现场测量
Your part — 您负责的部分 — Provide site access; we measure to the millimetre.提供现场通道;我们以毫米为单位精确测量。
Material & Package Selection材料与配套选择
Your part — 您负责的部分 — Confirm zone-matched material and package level.确认与区域匹配的材料与配套级别。
Quotation报价
Your part — 您负责的部分 — Review the itemised quotation and scope.审阅逐项报价与范围。
Drawing Approval图纸批准
Your part — 您负责的部分 — Approve drawings, colours, hardware and appliance dimensions.批准图纸、颜色、五金与电器尺寸。
Production Release生产放行
Your part — 您负责的部分 — Sign off the approved drawing pack and deposit before production.在生产前签认已批准图纸包并支付订金。
Fabrication / Ordering制作 / 下单
Your part — 您负责的部分 — We fabricate or order to the approved specification.我们按已批准的规格制作或下单。
Installation安装
Your part — 您负责的部分 — We install; you keep the site ready and accessible.我们负责安装;您保持现场就绪且可进入。
Handover & Warranty交付与保修
Your part — 您负责的部分 — Sign off handover to activate the warranty.签认交付以激活保修。
Confirmed before production release生产放行前确认
- Final measurement confirmed最终测量已确认
- Material confirmed材料已确认
- Colour confirmed颜色已确认
- Hardware confirmed五金已确认
- Appliance dimensions confirmed电器尺寸已确认
- Drawing approved图纸已批准
- Quotation approved报价已批准
- Deposit received订金已收讫
- Production release signed生产放行已签认
The go-ahead to build is signed by you and an ALUMAX representative — and an ELS coordinator on managed projects where applicable.开工许可由您和一位 ALUMAX 代表签署——在适用的托管项目中还需 ELS 协调员签署。 Read the full checklist guide →阅读完整的清单指南 →
The paper trail书面记录
You get documents, not just promises您得到的是文件,而不仅仅是承诺
Every project is backed by clear records — so scope, price and warranty stay unambiguous from start to handover.每个项目都有清晰的记录作支撑——让工作范围、价格和保修从开始到交付都明确无误。
Illustrative previews — the actual documents are issued for your project.示意预览——实际文件将为您的项目出具。