Product产品
Kitchen Cabinet Systems厨房橱柜系统
Dry and moisture-zone cabinet systems planned around cooking, storage and exposure.围绕烹饪、收纳与潮湿暴露规划的干区与防潮区域橱柜系统。
Sample image · real project photos coming soon样图 · 真实项目照片即将上线- Estimated price预估价格
- RM6,700–13,300 · Essential · complete kitchen, 8–16 ft run
- Suitable for适用于
- Daily-use kitchens where storage, appliance fit and moisture exposure are planned together — from dry runs to splash-heavy sink and hob zones.日常使用的厨房,将收纳、电器适配与潮湿暴露一并规划——从干区柜身到多溅水的水槽与炉灶区域。
- Material材料
- P6 board, plywood or aluminium — by moisture zoneP6 板、夹板或铝材——按潮湿区域选用
- Warranty保修
- 1-year cabinetry · 3-year aluminium · 2-year accessories柜体 1 年 · 铝制 3 年 · 配件 2 年 · Terms条款
What this product solves
Dry and moisture-zone cabinet systems planned around cooking, storage and exposure.围绕烹饪、收纳与潮湿暴露规划的干区与防潮区域橱柜系统。
More photos













Sample images · real Sarawak project photos coming soon.
Quick decision rule快速决策规则
Common Sarawak risks砂拉越常见风险
Moisture under the sink and around the hob水槽下方与炉灶周围的潮气
Steam and heat near cooking zones烹饪区域附近的蒸汽与热量
Heavy daily opening, loading and cleaning频繁的日常开合、承重与清洁
Specification level规格等级
Moisture-resistant board or plywood for the dry cabinet runs. Sink and splash-heavy zones upgrade to aluminium.干区柜身采用防潮板材或胶合板。水槽及多溅水区域升级为铝合金。
Better hardware, lighting, organisers and sealed detailing — with aluminium where wet-zone risk is higher.更优的五金、灯光、收纳件与密封细节——在湿区风险较高处采用铝合金。
Larger, wet, premium or full-house scope — project-configured materials, hardware and detailing, quoted per approved drawing.
Indicative budget参考预算
Complete systems, indicative only, excl. SST — an 18–20 ft run with an island is the Bespoke entry point, scaling up with scope. Confirmed after site measurement and an approved drawing.
What affects price影响价格的因素
- Total cabinet length and layout橱柜总长度与布局
- Material grade and wet-zone upgrades材料等级与湿区升级
- Hardware, organisers and lighting五金、收纳件与灯光
- Countertop, splashback and appliance cut-outs台面、挡水板与电器开孔
Prepare before quotation报价前准备
- Floor plan or rough sizes平面图或大致尺寸
- Appliance list and sizes电器清单与尺寸
- Site photos现场照片
- Preferred finishes and budget level偏好的饰面与预算级别
Scope clarity范围说明
What this price includes by default — and what is quoted separately so your budget stays clear.此价格默认包含哪些项目——以及哪些项目另行报价,让您的预算保持清晰。
Included by default默认包含
- 🔧 Cabinet supply + install🔧 橱柜供应+安装
- 📐 Site measurement📐 现场测量
- 🧰 Basic shop drawing / approved drawing🧰 基础施工图 / 已批准图纸
- 🪛 Standard hardware as specified🪛 按规格的标准五金
- 🧾 Warranty documentation🧾 保修文件
Excluded unless stated除非注明,否则不含
- 🪨 Countertop🪨 台面
- ⚡ Electrical / LED driver wiring⚡ 电气 / LED 驱动器布线
- 🚰 Plumbing relocation / sink trap🚰 水管迁移 / 水槽存水弯
- 🔨 Hacking / old cabinet removal🔨 打凿 / 拆除旧橱柜
- 💧 Waterproofing💧 防水工程
- 🧱 Wall repair / tiling / backsplash🧱 墙体修补 / 贴砖 / 挡水板
- 🍳 Appliances / sink / tap🍳 电器 / 水槽 / 水龙头
Finish range
116 plywood finishes
The plywood carcass and front finishes we stock — wood veneers and solid colours, each under its supplier code. Quote the code and you get exactly the finish you picked. Screens shift colour, so confirm against a physical sample.
21-01
21-02
21-03
21-04
21-09
21-10
21-11
22-01
22-07
22-08
22-13
22-14
22-15
22-16
22-17
22-18
22-19
22-20
22-39
22-40
22-42
22-44
22-47
22-48
22-49
22-50
22-51
22-52
22-54
22-56
22-59
22-62
22-63
22-64
22-66
22-68
22-69
22-70
22-74
22-76
22-78
22-79
22-80
22-81
22-83
22-86
22-93
23-01
23-02
23-03
23-04
23-05
23-06
23-07
23-08
23-09
23-10
23-19
23-20
23-23
23-24
23-25
23-27
23-29
23-34
23-36
23-38
23-42
23-45
23-46
23-50
25-07
25-08
25-19
25-20
25-21
25-22
25-23
25-24
25-25
25-26
25-27
25-28
25-30
25-31
25-32
25-33
25-34
25-35
25-36
25-37
25-38
25-39
25-40
25-41
25-42
25-43
25-44
25-45
25-46
25-48
1002
2025
2026
2027
3013
3044
3053
3055
6051
6108
6117
7025
7026
8005
8019
Kitchen cabinets in Sibu, Sarawak — built around how you cook and store砂拉越诗巫的厨房橱柜——围绕您的烹饪与收纳方式打造
Looking for a cabinet maker in Sibu? ALUMAX designs, supplies and installs cabinet systems across Sibu and the wider Sarawak — kitchen cabinets, wardrobes, TV and living storage, and bathroom vanities. We plan every cabinet around how the space is actually used: the cooking and prep flow, appliance fit, daily loading, and the moisture it will face. In Sarawak that last point decides how long a cabinet lasts, so we match material to the zone before anything else.在诗巫寻找橱柜制造商?ALUMAX 在诗巫及整个砂拉越设计、供应并安装橱柜系统——厨房橱柜、衣柜、电视与客厅收纳,以及浴室柜。我们围绕空间的实际使用方式来规划每一组橱柜:烹饪与备餐动线、电器尺寸、日常使用强度,以及将面对的潮湿。在砂拉越,最后这一点决定了橱柜的寿命,因此我们首先把材料与区域匹配。
Most kitchens are a mix of zones, and we build them that way. Dry cabinet runs use moisture-resistant board or plywood — which is not waterproof, but resists humidity well — while the sink base, splash zone and any wet kitchen step up to aluminium, which doesn’t absorb water the way a board core can. You don’t pay wet-zone prices for a whole dry kitchen, and you don’t put board where water lives. It is honest, zone-first cabinet work: material chosen by exposure, not by the finish you see in a showroom.多数厨房是混合区域,我们也照此打造。干区柜体采用防潮板或夹板——并非防水,但能很好地抵御潮湿——而水槽柜、溅水区与任何湿厨房则升级为铝材,它不会像板芯那样吸水。您无需为整个干区厨房支付湿区价格,也不会把板材放在有水之处。这是诚实、以区域为先的橱柜工作:按暴露程度选材,而非按您在展厅看到的饰面。
An ALUMAX kitchen cabinet build is measured on site and drawn for your approval before anything is cut, so it fits your space the first time. Indicatively, a complete Essential kitchen runs about RM6,700–13,300 for an 8–16 ft run, Signature about RM14,700–19,600 for a 12–16 ft run, and Bespoke from about RM22,000 for larger, wet and full-house kitchens — an 18–20 ft run with an island is the entry point, scaling up with scope — all complete systems, indicative only, excluding SST, and confirmed after site measurement and an approved drawing. From Q4 2026 you can compare finishes, hardware and panels at our Lanang showroom in Sibu; until then, send a floor plan, rough sizes and a few photos for a 2-minute budget range.ALUMAX 的厨房橱柜会先现场测量并出图供您审批,任何切割前都先确认,让它一次到位地契合您的空间。作为参考,一套完整的 标准级 厨房在 8–16 尺跨度约为 RM6,700–13,300,舒适级 在 12–16 尺约为 RM14,700–19,600,高端 用于更大型、湿区与全屋厨房则从约 RM22,000 起——18–20 尺跨度加中岛为入门起点,并随范围递增——皆为整套系统,仅供参考、未含 SST,并于现场测量与已批准图纸后确认。自 2026 年第四季度起,您可在诗巫拉让展厅比较饰面、五金与面板;在此之前,请发送平面图、大致尺寸与几张照片,即可获取 2 分钟预算范围。
Frequently asked常见问题
Where can I get kitchen cabinets in Sibu?在诗巫哪里可以买到厨房橱柜?
ALUMAX designs, supplies and installs kitchen cabinets across Sibu and the wider Sarawak — plus wardrobes, TV and living storage, and bathroom vanities. We measure on site, draw for your approval, then build. Start with a 2-minute budget range online, or visit the Lanang showroom from Q4 2026.ALUMAX 在诗巫及整个砂拉越设计、供应并安装厨房橱柜——还有衣柜、电视与客厅收纳,以及浴室柜。我们现场测量、出图供您审批,然后制作。可先在线获取 2 分钟预算范围,或自 2026 年第四季度起到拉让展厅参观。
How much do kitchen cabinets cost in Sibu?在诗巫,厨房橱柜的价格是多少?
Indicatively, a complete ALUMAX kitchen runs about RM6,700–13,300 at our Essential level (an 8–16 ft run), RM14,700–19,600 at Signature (12–16 ft), and from RM22,000 at Bespoke for larger, wet or full-house kitchens — an 18–20 ft run with an island is the entry point, scaling up with scope — all complete systems, excluding SST. Figures are indicative only and confirmed after site measurement and an approved drawing. Run length, material, hardware, finishes and countertop all move the final price.参考而言,一套完整的 ALUMAX 厨房在标准级约为 RM6,700–13,300(8–16 尺跨度),舒适级约为 RM14,700–19,600(12–16 尺),高端用于更大型、湿区或全屋厨房则从 RM22,000 起——18–20 尺跨度加中岛为入门起点,并随范围递增——皆为整套系统、未含 SST。这些数字仅供参考,并于现场测量与已批准图纸后确认。柜体长度、材料、五金、饰面与台面都会影响最终价格。
What material is best for kitchen cabinets in Sarawak?在砂拉越,厨房橱柜用什么材料最好?
It depends on the zone. Moisture-resistant board or plywood suits dry and semi-dry runs; the sink base, splash zone and wet kitchen step up to aluminium, which doesn’t absorb water like a board core. We match each zone separately rather than forcing one material across the whole kitchen.取决于区域。防潮板或夹板适合干区与半干区;水槽柜、溅水区与湿厨房则升级为铝材,它不会像板芯那样吸水。我们分区匹配,而非将一种材料强加于整个厨房。
Do you supply and install, or just supply?你们是供应并安装,还是只供应?
Both. ALUMAX supplies and installs in Sibu and across Sarawak under a confirmed scope. We measure on site and produce a drawing for your approval before production, so awkward corners, plumbing and appliance positions are planned to fit before anything is cut.两者都有。ALUMAX 在诗巫及整个砂拉越按确认范围供应并安装。我们现场测量并在生产前出图供您审批,让刁钻的角落、水管与电器位置在切割前都规划妥当。
How long does a kitchen cabinet project take?一个厨房橱柜项目需要多长时间?
It varies with scope, material and site condition, and the exact schedule is confirmed in your quotation, with installation typically around 8–12 weeks (sourced from our supplier, so the sourcing lead time sets the range). The sequence is fixed, though: showroom or photos, site measurement, approved drawing, then production and installation. Nothing is built until you’ve signed off the drawing.
Do you make wardrobes and other cabinets too, not just kitchen?除了厨房,你们也做衣柜与其他橱柜吗?
Yes. Alongside kitchen cabinets we build wardrobes, living-room and TV storage, bathroom vanities, and office systems — and we take on special items like custom furniture and partitions. The same zone-first material logic and measurement-and-drawing process applies to all of them.是的。除了厨房橱柜,我们还制作衣柜、客厅与电视收纳、浴室柜与办公系统——也承接定制家具与隔断等特别项目。同样以区域为先的选材逻辑与测量出图流程适用于所有这些。
What’s included in a cabinet quotation?橱柜报价包含哪些内容?
Cabinet supply, material and hardware selection, installation under the confirmed scope, and warranty documentation. Countertop, electrical, plumbing and tiling are quoted as separate, clearly-stated items so your budget stays clear. Final scope follows site measurement and an approved drawing.橱柜供应、材料与五金选配、在确认范围内的安装,以及保修文件。台面、电气、水管与铺砖会作为单独、清晰列明的项目报价,让您的预算保持清晰。最终范围以现场测量与已批准图纸为准。
Next step下一步
Get your获取您的 kitchen厨房 budget range预算范围
2-minute pre-check — we’ll confirm material and scope after measurement.2 分钟预检 — 我们将在测量后确认材料与范围。