Where can I get kitchen cabinets in Sibu?在诗巫哪里可以买到厨房橱柜?+
ALUMAX designs, supplies and installs kitchen cabinets across Sibu and the wider Sarawak — plus wardrobes, TV and living storage, and bathroom vanities. We measure on site, draw for your approval, then build. Start with a 2-minute budget range online, or visit the Lanang showroom from Q4 2026.ALUMAX 在诗巫及整个砂拉越设计、供应并安装厨房橱柜——还有衣柜、电视与客厅收纳,以及浴室柜。我们现场测量、出图供您审批,然后制作。可先在线获取 2 分钟预算范围,或自 2026 年第四季度起到拉让展厅参观。
How much do kitchen cabinets cost in Sibu?在诗巫,厨房橱柜的价格是多少?+
Indicatively, a complete ALUMAX kitchen runs about RM6,700–13,300 at our Essential level (an 8–16 ft run), RM14,700–19,600 at Signature (12–16 ft), and from RM22,000 at Bespoke for larger, wet or full-house kitchens — an 18–20 ft run with an island is the entry point, scaling up with scope — all complete systems, excluding SST. Figures are indicative only and confirmed after site measurement and an approved drawing. Run length, material, hardware, finishes and countertop all move the final price.参考而言,一套完整的 ALUMAX 厨房在标准级约为 RM6,700–13,300(8–16 尺跨度),舒适级约为 RM14,700–19,600(12–16 尺),高端用于更大型、湿区或全屋厨房则从 RM22,000 起——18–20 尺跨度加中岛为入门起点,并随范围递增——皆为整套系统、未含 SST。这些数字仅供参考,并于现场测量与已批准图纸后确认。柜体长度、材料、五金、饰面与台面都会影响最终价格。
What material is best for kitchen cabinets in Sarawak?在砂拉越,厨房橱柜用什么材料最好?+
It depends on the zone. Moisture-resistant board or plywood suits dry and semi-dry runs; the sink base, splash zone and wet kitchen step up to aluminium, which doesn’t absorb water like a board core. We match each zone separately rather than forcing one material across the whole kitchen.取决于区域。防潮板或夹板适合干区与半干区;水槽柜、溅水区与湿厨房则升级为铝材,它不会像板芯那样吸水。我们分区匹配,而非将一种材料强加于整个厨房。
Do you supply and install, or just supply?你们是供应并安装,还是只供应?+
Both. ALUMAX supplies and installs in Sibu and across Sarawak under a confirmed scope. We measure on site and produce a drawing for your approval before production, so awkward corners, plumbing and appliance positions are planned to fit before anything is cut.两者都有。ALUMAX 在诗巫及整个砂拉越按确认范围供应并安装。我们现场测量并在生产前出图供您审批,让刁钻的角落、水管与电器位置在切割前都规划妥当。
How long does a kitchen cabinet project take?一个厨房橱柜项目需要多长时间?+
It varies with scope, material and site condition, and the exact schedule is confirmed in your quotation, with installation typically around 8–12 weeks (sourced from our supplier, so the sourcing lead time sets the range). The sequence is fixed, though: showroom or photos, site measurement, approved drawing, then production and installation. Nothing is built until you’ve signed off the drawing.
Do you make wardrobes and other cabinets too, not just kitchen?除了厨房,你们也做衣柜与其他橱柜吗?+
Yes. Alongside kitchen cabinets we build wardrobes, living-room and TV storage, bathroom vanities, and office systems — and we take on special items like custom furniture and partitions. The same zone-first material logic and measurement-and-drawing process applies to all of them.是的。除了厨房橱柜,我们还制作衣柜、客厅与电视收纳、浴室柜与办公系统——也承接定制家具与隔断等特别项目。同样以区域为先的选材逻辑与测量出图流程适用于所有这些。
What’s included in a cabinet quotation?橱柜报价包含哪些内容?+
Cabinet supply, material and hardware selection, installation under the confirmed scope, and warranty documentation. Countertop, electrical, plumbing and tiling are quoted as separate, clearly-stated items so your budget stays clear. Final scope follows site measurement and an approved drawing.橱柜供应、材料与五金选配、在确认范围内的安装,以及保修文件。台面、电气、水管与铺砖会作为单独、清晰列明的项目报价,让您的预算保持清晰。最终范围以现场测量与已批准图纸为准。