How the price is built价格如何构成Bagaimana harga dibina
Every component on its own line每个组成部分各占一行Setiap komponen pada barisnya sendiri
A door is more than its leaf. The indicative price itemises leaf and panels, frame, infill and glass, hardware, locking, finish, the opening surround, opening preparation, installation and old-door removal — nothing is silently bundled. Two of those are deliberately separate: the structural opening is the wall the door fixes into, while the surround is only the visible finish wrapped around it — a common quotation mistake is to confuse the brick substrate with an aluminium, timber or stone surround. The surround is measured by casing run — the head and both jambs — not door area. For an aluminium door we price the base live — frame, leaf and standard hardware — and mark the rest as confirmed at quotation. A timber door, or a fire or security door, is a designed and certified build, so it is specified and priced at consultation rather than guessed at online.门不仅仅是门扇。参考价格会逐项列出门扇与门板、门框、门芯与玻璃、五金、锁具、饰面、洞口饰边、洞口预备、安装以及旧门拆除——没有任何东西被悄悄打包。其中两项刻意分开:结构洞口是门所固定的墙体,而饰边只是包裹在其外面的可见饰面——报价中常见的错误,就是把砖墙基层与铝、木或石材饰边混为一谈。饰边按门套长度(门头和两侧门框)计量,而不是按门的面积。铝门我们实时计算基础价格——门框、门扇和标准五金——其余项目标注为在报价时确认。木门,以及防火门或防盗门,属于经设计和认证的定制产品,因此在咨询时界定规格并定价,而不是在线猜测。Pintu lebih daripada sekadar daunnya. Harga indikatif memperincikan daun dan panel, bingkai, isian dan kaca, perkakasan, kunci, kemasan, sempadan bukaan, penyediaan bukaan, pemasangan dan pembuangan pintu lama — tiada apa yang digabungkan secara senyap. Dua daripadanya sengaja diasingkan: bukaan struktur ialah dinding tempat pintu dipasang, manakala sempadan hanyalah kemasan yang kelihatan membalutnya — kesilapan sebut harga yang lazim ialah mengelirukan substrat bata dengan sempadan aluminium, kayu atau batu. Sempadan diukur mengikut panjang bingkai penutup — kepala dan kedua-dua jamb — bukan keluasan pintu. Bagi pintu aluminium, kami menghargakan asas secara langsung — bingkai, daun dan perkakasan standard — dan menandakan selebihnya sebagai disahkan semasa sebut harga. Pintu kayu, atau pintu kebakaran atau keselamatan, ialah binaan yang direka dan diperakui, jadi ia ditentukan spesifikasi dan dihargakan semasa perundingan dan bukannya diagak dalam talian.
Your online configuration and price are indicative. ALUMAX validates the layout, dimensions, materials and accessories before issuing the formal quotation. The order is confirmed only when the quotation, drawings and deposit are received.您的在线配置与价格仅供参考。ALUMAX 会在开出正式报价之前核实布局、尺寸、材料与配件。订单仅在报价、图纸与订金齐备后确认。Konfigurasi dan harga dalam talian anda adalah indikatif. ALUMAX mengesahkan susun atur, dimensi, bahan dan aksesori sebelum mengeluarkan sebut harga rasmi. Pesanan hanya disahkan apabila sebut harga, lukisan dan deposit diterima.
Payment follows a confirmed quotation — an indicative estimate is never a payable order.付款在报价确认之后进行——参考估价绝不是可付款的订单。Pembayaran dibuat selepas sebut harga disahkan — anggaran indikatif bukanlah pesanan yang boleh dibayar. Payment options付款选项Pilihan pembayaran
This subtotal includes the priced items and upgrades selected above. Items marked “Quotation required”, plus any separately quoted installation, specialist work, logistics, tax and ELS fees, are excluded.此小计包含上方所选的已定价项目与升级项。标注为“须经报价”的项目,以及另行报价的安装、专项工程、物流、税项与 ELS 费用,均不包含在内。Subjumlah ini merangkumi item berharga dan naik taraf yang dipilih di atas. Item bertanda “Sebut harga diperlukan”, serta pemasangan, kerja pakar, logistik, cukai dan yuran ELS yang disebut harga secara berasingan, tidak termasuk.
Prices are indicative. SST, if applicable, is shown on the quotation. Published rates apply within the Sibu service area. ALUMAX validates the selected layout, dimensions, materials and accessories; the final quotation follows site measurement and approved drawings. Other Sarawak locations are supported, with travel and logistics quoted separately.价格为参考价。SST(如适用)将在报价单上列明。所公布的价目适用于诗巫服务范围内。ALUMAX 会核实所选的格局、尺寸、材料与配件;最终报价以上门测量及经批准的图纸为准。砂拉越其他地区亦可承接,交通与物流另行报价。Harga adalah anggaran. SST, jika berkenaan, dinyatakan dalam sebut harga. Kadar yang diterbitkan terpakai dalam kawasan perkhidmatan Sibu. ALUMAX mengesahkan susun atur, dimensi, bahan dan aksesori yang dipilih; sebut harga akhir mengikut pengukuran tapak dan lukisan yang diluluskan. Lokasi Sarawak yang lain turut disokong, dengan perjalanan dan logistik disebut harga secara berasingan. A minimum billable area applies to small openings, so the smallest job costs more than the rate multiplied by its size.小尺寸开口按最低计费面积计算,因此最小的工程费用会高于单价乘以其尺寸。Luas boleh-bil minimum terpakai bagi bukaan kecil, jadi kerja yang paling kecil berharga lebih daripada kadar didarab dengan saiznya.