Project basis
ALUMAX in Kuching
Sarawak's capital to the south-west, reached on a project basis — we plan delivery and installation around the trip.
What we supply & install
The full ALUMAX range in Kuching
Every product line is available here — supplied and installed, measured and drawn for your approval before production. Only the logistics change by town, never the standard we build to.
How we work in Kuching
Measurement, logistics & lead time
The honest coverage terms here — exact figures are confirmed in your quotation before you commit.
Site measurement现场测量
Site measurement is planned with your project; the measurement and travel basis is confirmed in your quotation before you commit.
Minimum project scope
Most cost-effective at room-scale or larger, so the travel is proportionate to the work — smaller items can often ride along with a nearby project. The exact minimum is confirmed per enquiry.
Travel & logistics
Delivery, access, crew travel and any overnight stay are planned around the specific job. Outstation travel is charged at 10%, or a minimum of RM2,500 per trip, confirmed in your quotation.
Lead-time process
The standard sequence (site measurement → approved drawing → production → installation, typically 8–12 weeks) plus freight and scheduling time for the trip, confirmed per job.
Installation安装
Our crew travels to site and installs — for farther towns we may fit over consecutive days, planned around your job.
Proof
Completed projects near Kuching
We publish completed projects from this area as the photos are approved — we don't pad this page with stock images. Ask on WhatsApp what we've built near you, or see the full drawing-to-handover journey and sample specifications.
Get your获取您的 Kuching price in 2 minutes
Tell us the product, rough sizes and your target date. We reply with an indicative range and the coverage basis for your town — no obligation.
Based in Sibu · we deliver and install across Sarawak · figures confirmed in your quotation