Do you do office furniture in Sibu?你们在诗巫做办公家具吗?Adakah anda membuat perabot pejabat di Sibu?+
Yes. PROWORKS Office Systems by ALUMAX supplies and installs office furniture across Sibu and the wider Sarawak — workstations, storage, pantry cabinets and reception counters for offices, clinics, tuition centres, showrooms and shoplots. We scope from your floor plan and headcount, then measure, draw and install.是的。PROWORKS Office Systems by ALUMAX 在诗巫及整个砂拉越供应并安装办公家具——为办公室、诊所、补习中心、展厅与店屋提供工位、储物、茶水间柜体与接待柜台。我们从你的平面图与人数确定范围,然后测量、出图并安装。Ya. PROWORKS Office Systems by ALUMAX membekal dan memasang perabot pejabat di seluruh Sibu dan Sarawak yang lebih luas — stesen kerja, storan, kabinet pantri dan kaunter penyambut tetamu untuk pejabat, klinik, pusat tuisyen, bilik pameran dan lot kedai. Kami menskop daripada pelan lantai dan bilangan kakitangan anda, kemudian mengukur, melukis dan memasang.
How much does office furniture cost per workstation in Sibu?在诗巫,每个工位的办公家具要多少钱?Berapa kos perabot pejabat setiap stesen kerja di Sibu?+
Quotation required. Manager setups, storage runs and reception counters are quoted per spec. Figures are indicative only and confirmed after floor plan, headcount and site measurement. Spec, quantities and finishes move the final figure.须经报价。经理套装、储物柜列与接待柜台按规格另行报价。数字仅供参考,最终以平面图、人数与现场测量确认。规格、数量与饰面会影响最终价格。Sebut harga diperlukan. Set pengurus, larian storan dan kaunter penyambut tetamu disebut harga mengikut spesifikasi. Angka ini indikatif sahaja dan disahkan selepas pelan lantai, bilangan kakitangan dan ukuran tapak. Spesifikasi, kuantiti dan kemasan menggerakkan angka akhir.
How do you handle cabling and power at each desk?每张办公桌的布线与供电你们怎么处理?Bagaimana anda menangani pendawaian dan kuasa di setiap meja?+
Cable management is designed in, not added later. We map power and data positions to your floor plan early so cabling follows the layout instead of fighting it.理线是设计进去的,而非事后加上。我们会及早按您的平面图确定电源与数据位置,让布线顺着布局走,而不是与布局相冲突。Pengurusan kabel direka sejak awal, bukan ditambah kemudian. Kami memetakan kedudukan kuasa dan data pada pelan lantai anda lebih awal supaya pendawaian mengikut susun atur, bukan bercanggah dengannya.
Do you provide a quotation we can submit for approval?你们会提供可用于报批的报价单吗?Adakah anda menyediakan sebut harga yang boleh kami serahkan untuk kelulusan?+
Yes. We produce a tender-ready, itemised breakdown after site measurement so you can submit it for budget or management approval. The scope, quantities and lead time are set out clearly, and nothing is built until the drawing and quotation are confirmed.会的。我们会在现场测量后出具可用于投标、逐项列明的明细,供你提交预算或管理层审批。范围、数量与交期都会清楚列出,并在图纸与报价确认之前不会动工。Ya. Kami menghasilkan pecahan sedia-tender dan terperinci selepas ukuran tapak supaya anda boleh menghantarnya untuk kelulusan bajet atau pengurusan. Skop, kuantiti dan tempoh masa disenaraikan dengan jelas, dan tiada apa yang dibina sehingga lukisan dan sebut harga disahkan.
Can you match the furniture to our brand and ergonomics standards?你们能让家具契合我们的品牌与人体工学标准吗?Bolehkah anda padankan perabot dengan standard jenama dan ergonomik kami?+
Yes. We size workstations to your headcount and the way each role is worked, choose ergonomic desks and chairs and screen partition heights, and specify finishes to suit your brand. Acoustic screen partitions and lockable storage are added where open-plan noise or shared documents call for them.可以。我们会按你的人数与各岗位的工作方式确定工位尺寸,选择人体工学办公桌与座椅以及屏风隔断的高度,并按你的品牌选定饰面。在开放式空间噪音或共享文件有需要之处,会加配隔音屏风隔断与可上锁储物。Ya. Kami menyesuaikan saiz stesen kerja mengikut bilangan kakitangan dan cara setiap peranan bekerja, memilih meja dan kerusi ergonomik serta ketinggian sekatan skrin, dan mengspesifikasikan kemasan untuk sesuai dengan jenama anda. Sekatan skrin akustik dan storan berkunci ditambah di mana bunyi ruang terbuka atau dokumen berkongsi memerlukannya.
How quickly can an office fit-out be ready?办公室装修多快能完成?Berapa cepat fit-out pejabat boleh siap?+
Lead time depends on scope, quantities and site condition, and we plan against your target move-in date. Lead time confirmed with your quotation, after measurement. Share your floor plan, headcount and deadline, and we’ll confirm quantities, lead time and the install sequence after measurement.交期取决于范围、数量与现场状况,我们会以你的目标入驻日期为准来规划。交期于测量后随报价确认。提供你的平面图、人数与截止日期,我们会在测量后确认数量、交期与安装顺序。Tempoh siap bergantung pada skop, kuantiti dan keadaan tapak, dan kami merancang mengikut tarikh sasaran anda untuk berpindah masuk. Tempoh siap disahkan bersama sebut harga anda, selepas pengukuran. Kongsi pelan lantai, bilangan pekerja dan tarikh akhir anda, dan kami akan mengesahkan kuantiti, tempoh siap dan urutan pemasangan selepas pengukuran.