Home首页Laman UtamaWardrobes衣柜Almari Pakaian

Build & price your wardrobe

Wardrobes — price by type

Pick the wardrobe — swing, sliding or open walk-in — choose the tier and run length, and the indicative price updates as you go, then sends straight to WhatsApp.

Which wardrobe?

Specification

Swing Wardrobe

The everyday hinged-door wardrobe — best value per foot, full-access doors.

From RM 580 / ftLead time交期Tempoh siap · Installed in 8–12 weeks8–12 周内完成安装Dipasang dalam 8–12 mingguWarranty保修Waranti · 1-year carcass · 3-year aluminium · 2-year accessories柜身 1 年 · 铝制 3 年 · 配件 2 年
Essential标准级RM 580 / ft
Material材料Bahan
P6 · melamine
Spec
hinged doors, adjustable shelves, hanging rail, soft-close
Size / limits
priced per running foot
Bespoke高端RM 980 / ft
Material材料Bahan
E0 · honeycomb / mixed
Spec
hinged doors, adjustable shelves, hanging rail, soft-close
Size / limits
priced per running foot

Included — installation scope

  • Supply & install
  • Carcass & doors
  • Adjustable shelves
  • Hanging rail
  • Soft-close hinges

Options

  • Organisers, drawers, pull-outsrequest
  • LED-ready profilesrequest

Not included

  • SST
  • Hacking, demolition or reinstatement
  • Wall repair, skim coat & paint touch-up
  • Removal of existing wardrobe
  • Hidden wall unevenness or damp

Configure & price

Tier
Internals
Lighting
Indicative estimateRM 2,320 ex-SST
View project

Indicative & ex-SST — confirmed after a free site measurement and an approved drawing.

Your online configuration and price are indicative. ALUMAX validates the layout, dimensions, materials and accessories before issuing the formal quotation. The order is confirmed only when the quotation, drawings and deposit are received.

Send this configuration to ALUMAX

Leave your WhatsApp and our team validates the layout & accessories, then prepares your quotation — usually within 1 working day. No obligation, nothing to pay yet.

How the price works

An honest catalogue price — not a made-up total

The estimate is the real catalogue rate for the tier and area you choose, with the job minimum applied — the same figure the staff quotation tool uses. Options marked “request” are confirmed at a free site measurement, so nothing here is a guess or an invented add-on cost.

This tool builds and prices one product. The rest of the room is designed and coordinated by ELS, so one project runs end to end without you managing separate trades. Design the whole room with ELS

Prices are indicative and exclude SST. Final price follows a free site measurement and an approved drawing. We supply & install across Sarawak; outstation projects add a travel charge, confirmed in your quotation.

Get My Price获取我的价格Dapatkan Harga Saya