Home首页Laman UtamaBathroom Vanities

Build & price your vanity

Bathroom vanities — price by run

Choose the tier and run length; the indicative price updates as you go, then sends straight to WhatsApp. Built for wet and dry bathroom zones.

Specification

Bathroom Vanity

A wet-zone vanity that shrugs off moisture — aluminium or ACP carcass, from a dry powder room to a full wet bathroom.

From RM 1,100 / setLead time交期Tempoh siap · Installed in 8–12 weeks8–12 周内完成安装Dipasang dalam 8–12 mingguWarranty保修Waranti · 3-year aluminium · 2-year accessories铝制 3 年 · 配件 2 年
Essential标准级RM 1,100 / set
Material材料Bahan
Aluminium / marine ply
Spec
moisture-resistant wet-zone build
Size / limits
one vanity
Signature舒适级RM 2,200 / set
Material材料Bahan
ACP · aluminium wet zone
Spec
moisture-resistant wet-zone build
Size / limits
one vanity
Bespoke高端RM 3,300 / set
Material材料Bahan
ACP · aluminium wet zone
Spec
integrated basin · Blum · LED mirror
Size / limits
one vanity

Included — installation scope

  • Supply & install
  • Aluminium / ACP carcass
  • Soft-close doors
  • Standard basin cut-out

Options

  • Stone / sintered top石材/岩板台面request
  • LED anti-fog mirror+RM 680 / each

Not included

  • SST
  • Basin, tap & sanitary ware (unless stated)
  • Plumbing relocation水管改位Pemindahan paip air
  • Wall tiling & waterproofing
  • Hidden leakage or wet-wall defects

Configure & price

Tier
Countertop
Mirror
Indicative estimateRM 2,200 ex-SST
View project

Indicative & ex-SST — confirmed after a free site measurement and an approved drawing.

Your online configuration and price are indicative. ALUMAX validates the layout, dimensions, materials and accessories before issuing the formal quotation. The order is confirmed only when the quotation, drawings and deposit are received.

Send this configuration to ALUMAX

Leave your WhatsApp and our team validates the layout & accessories, then prepares your quotation — usually within 1 working day. No obligation, nothing to pay yet.

How the price works

An honest catalogue price — not a made-up total

The estimate is the real catalogue rate for the tier and area you choose, with the job minimum applied — the same figure the staff quotation tool uses. Options marked “request” are confirmed at a free site measurement, so nothing here is a guess or an invented add-on cost.

This tool builds and prices one product. The rest of the room is designed and coordinated by ELS, so one project runs end to end without you managing separate trades. Design the whole room with ELS

Prices are indicative and exclude SST. Final price follows a free site measurement and an approved drawing. We supply & install across Sarawak; outstation projects add a travel charge, confirmed in your quotation.

Get My Price获取我的价格Dapatkan Harga Saya