All B2B resources

ALUMAX Contract · Bill of Quantities

Scope the project. We’ll price it.

A blank, structured bill of quantities for an ALUMAX contract project — cabinetry, wet modules, storage, the aluminium envelope and glass, set out by section. List the scope and quantities; ALUMAX returns the rates, priced to one specification with one accountable warranty.

ALUMAX · Sibu, Sarawak · alumax.pro/contract

Project项目Projek

Project details

Project / development
Developer / client
Location (town, Sarawak)
No. of units / rooms
Prepared by
Date
Revision

How to use: fill the description, unit and quantity per line for the scope you need. Leave the Rate and Amount columns blank — ALUMAX prices them against your specification. Units follow the guide on the last page.

Bill of quantities

A — Cabinetry & storage

A1Kitchen — dry zoneTall units, base & wall cabinets, worktop (dry run)
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
A1.1
A1.2
A1.3
A1.4
Section subtotal
A2Kitchen — wet zoneSink base & wet run — aluminium / ACP / honeycomb carcass
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
A2.1
A2.2
A2.3
Section subtotal
A3Wardrobe & bedroom storageBy room / unit type
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
A3.1
A3.2
A3.3
A3.4
Section subtotal
A4Bathroom vanity浴室柜Kabinet sinki bilik airAluminium-carcass vanity + mirror cabinet
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
A4.1
A4.2
A4.3
Section subtotal
A5TV & living storage电视柜与客厅储物Storan TV & ruang tamuFeature wall, sideboard, display
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
A5.1
A5.2
A5.3
Section subtotal

Bill of quantities

B — Aluminium envelope & glass

B1Aluminium windows铝窗Tingkap aluminiumBy type & opening — sizes to schedule
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
B1.1
B1.2
B1.3
B1.4
Section subtotal
B2Aluminium doors铝门Pintu aluminiumSwing / sliding / folding — by opening
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
B2.1
B2.2
B2.3
Section subtotal
B3Glass & mirrorShower screens, partitions, mirrors — tempered to use
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
B3.1
B3.2
B3.3
Section subtotal

Bill of quantities

C — Commercial & fit-out

C1Office & workstationsBy headcount — desks, storage, pantry
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
C1.1
C1.2
C1.3
C1.4
Section subtotal
C2Reception & countersReception, service & back-of-house counters
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
C2.1
C2.2
C2.3
Section subtotal

Bill of quantities

D — Finishes & external works

D1Flooring地板LantaiSPC rigid-core plank — by area
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
D1.1
D1.2
Section subtotal
D2Wall finishesWPC fluted / feature & facade panels
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
D2.1
D2.2
Section subtotal
D3TilesBathroom / porch tile packages
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
D3.1
D3.2
Section subtotal
D4Shading & externalCanopies, louvres, brise-soleil
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
D4.1
D4.2
Section subtotal
D5Fencing & securityBoundary fence & gate systems
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
D5.1
D5.2
Section subtotal

Bill of quantities

E — Preliminaries

E1Delivery & site logisticsTransport, hoisting, access to unit / floor
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
E1.1
E1.2
Section subtotal
E2Installation & commissioningInstallation by ALUMAX's managed installation team, testing, final adjustment由 ALUMAX 管理的安装团队安装、测试及最终调整Pemasangan oleh pasukan pemasangan terurus ALUMAX, ujian, pelarasan akhir
ItemDescription & finishUnit单位Unit hargaQty数量KuantitiRate (RM)Amount (RM)
E2.1
E2.2
Section subtotal

Notes

Units, summary & exclusions

Pricing units

nos (each) · m (linear metre) · m² (square metre) · set · lot · item. Aluminium windows and doors are usually priced per m² or per opening; cabinetry per linear metre or per unit; glass per m² of the finished pane.

Summary汇总Ringkasan

A — Cabinetry & storage
B — Aluminium envelope & glass
C — Commercial & fit-out
D — Finishes & external works
E — Preliminaries
Project subtotal (SST, if applicable, on quotation)项目小计(SST(如适用)列于报价单)Subjumlah projek (SST, jika berkenaan, dalam sebut harga)

Standard exclusions

  • Hidden site defects — damp, leaks, walls out of plumb, termite damage — unless separately quoted.
  • Builder’s work, wet trades, tiling, electrical rough-in and plumbing rough-in by others unless stated.
  • SST is not charged: ALUMAX is not currently SST-registered. If ALUMAX becomes registered, SST at the prevailing statutory rate will apply to the whole invoice, including transport and installation, and will be shown on the tax invoice.不收取 SST:ALUMAX 目前尚未注册 SST。若 ALUMAX 日后注册,SST 将按现行法定税率适用于整张发票(含运输与安装),并在税务发票上列示。SST tidak dikenakan: ALUMAX belum berdaftar SST buat masa ini. Jika ALUMAX berdaftar kelak, SST pada kadar berkanun semasa akan dikenakan ke atas keseluruhan invois, termasuk pengangkutan dan pemasangan, dan akan ditunjukkan pada invois cukai.
  • Appliances and loose furniture are supply-only where listed.
  • Rates are confirmed against an approved shop drawing and a recorded site measurement.
  • ELS design & specification is included; whole-project coordination is quoted per project — neither is a priced line here.

Next step下一步Langkah seterusnya

Send the filled BOQ to ALUMAX for pricing.

Return this document or your own drawings and ALUMAX will price it, prototype the specification where it repeats, and quote the package — produced and installed under one specification, QC and warranty.

ALUMAX Contract · alumax.pro/contract

Estimate or ask ALUMAX估算或咨询 ALUMAXAnggar atau tanya ALUMAXEstimate My Project估算我的项目Anggar Projek Saya Ask on WhatsAppWhatsApp 咨询Tanya di WhatsApp