Eleven controlled steps from brief to handover.
Bulk production only works when nothing is left to chance. This is exactly how a contract project runs at ALUMAX — from your brief and BOQ, through a real prototype you approve and a frozen specification, to batch QC, installation and handover.
Why the process matters
Nothing goes to bulk production until you've approved a real prototype.
A developer can't commit to hundreds of units on a drawing. So we prove the product first — a sample board and a real prototype you approve — then freeze the specification. Only then does anything go to scale. Every step exists to protect that.
The contract production workflow
From one brief to an entire development — eleven steps
- 01
Brief / BOQ
You send drawings, a bill of quantities or a written brief — whatever you have. Nothing is required to start the conversation.
You + your team - 02
Technical review
We check the brief against what can actually be built — materials, sizes, moisture zones, buildability and any gaps in the drawings.
ALUMAX + ELS - 03
Value engineering
Where a material or detail can be simplified without losing performance, we propose it — so the specification is right for the budget before anyone commits.
ALUMAX + ELS
- 04
Sample board
Physical finishes, colours and hardware — confirmed against real samples, not a screen. The signed board becomes the reference for the whole project.
ALUMAX - 05
Prototype / mock-up
We build one real unit — a kitchen, a guest room, a workstation — to the reviewed specification, so you can see and test the actual product before scale.
ALUMAX - 06
Client approval
You inspect the prototype and sign it off. Nothing proceeds to bulk production until the real thing is approved — not a drawing of it.
You - 07
Specification freeze
Every material, size, finish, fitting and tolerance is locked to the approved prototype. The frozen specification is what every unit is measured against.
Locked together
- 08
Bulk production
The frozen specification is routed to the right production — FLYHOME for standardized cabinetry, selected specialist partners for made-to-spec — and produced at volume.
ALUMAX production network - 09
Batch QC
Quality is checked across the batch against the frozen specification — not one sign-off at the end — so the last unit matches the approved prototype.
ALUMAX
- 10
Delivery / installation
Delivered in phases to your site programme and installed the same way in every unit, coordinated with your build sequence.
ALUMAX - 11
Handover
Checked per unit and handed over clean, with one accountable supplier behind the product warranty for the whole package.
ALUMAX → You
What the specification freeze locks
The frozen spec is what every unit is checked against.
- Materials & board grades by moisture zone
- Dimensions & tolerances
- Finishes & colours — to the signed sample board
- Hardware & fittings
- M&E cut-outs & service positions
- Installation details & fixings
Once frozen, a change is a documented change — not a surprise on unit fifty. That is what makes a run repeatable, and what protects your programme and your budget.
Need the design and specification developed before you tender? ELS by ALUMAX creates the design and specification — so your drawings, sample boards and BOQ are ready to price, prototype and repeat.
See it for your sector
The same process, one approved prototype at a time
Have a project to scope?
Send the brief. We'll prototype it before we scale it.
Share a drawing or a BOQ and we'll review it, sample it, prototype it and freeze the specification — then produce, install and hand over under ALUMAX specification, QC and warranty.