Contract Production
Eleven controlled steps from brief to handover.
Bulk production only works when nothing is left to chance.只有在不留任何侥幸的情况下,批量生产才行得通。Pengeluaran pukal hanya berjaya apabila tiada apa yang dibiarkan kepada nasib.
More details更多详情Butiran lanjut
This is exactly how a contract project runs at ALUMAX — from your brief and BOQ, through a real prototype you approve and a frozen specification, to batch QC, installation and handover.这正是 ALUMAX 合约项目的运作方式——从您的需求说明和工料清单,到您确认的真实样板和冻结的规格,再到批次质检、安装与交接。Inilah cara projek kontrak berjalan di ALUMAX — daripada taklimat dan BOQ anda, melalui prototaip sebenar yang anda luluskan dan spesifikasi yang dibekukan, hingga QC kelompok, pemasangan dan penyerahan.
Why the process matters
Nothing goes to bulk production until you've approved a real prototype.
A developer can't commit to hundreds of units on a drawing. So we prove the product first — a sample board and a real prototype you approve — then freeze the specification. Only then does anything go to scale. Every step exists to protect that.
The contract production workflow
From one brief to an entire development — eleven steps
- 01
Brief / BOQ
You send drawings, a bill of quantities or a written brief — whatever you have. Nothing is required to start the conversation.
You + your team - 02
Technical review
We check the brief against what can actually be built — materials, sizes, moisture zones, buildability and any gaps in the drawings.
ALUMAX - 03
Value engineering
Where a material or detail can be simplified without losing performance, we propose it — so the specification is right for the budget before anyone commits.
ALUMAX
- 04
Sample board
Physical finishes, colours and hardware — confirmed against real samples, not a screen. The signed board becomes the reference for the whole project.
ALUMAX - 05
Prototype / mock-up
We build one real unit — a kitchen, a guest room, a workstation — to the reviewed specification, so you can see and test the actual product before scale.
ALUMAX - 06
Client approval
You inspect the prototype and sign it off. Nothing proceeds to bulk production until the real thing is approved — not a drawing of it.
You - 07
Specification freeze
Every material, size, finish, fitting and tolerance is locked to the approved prototype. The frozen specification is what every unit is measured against.
Locked together
- 08
Bulk production
The frozen specification is routed to the right production — FLYHOME for standardized cabinetry, selected specialist partners for made-to-spec — and produced at volume.
ALUMAX production network - 09
Batch QC
Quality is checked across the batch against the frozen specification — not one sign-off at the end — so the last unit matches the approved prototype.
ALUMAX
- 10
Delivery / installation
Delivered in phases to your site programme and installed the same way in every unit, coordinated with your build sequence.
ALUMAX - 11
Handover交付Serah terima
Checked per unit and handed over clean, with one accountable supplier behind the product warranty for the whole package.
ALUMAX → You
What the specification freeze locks
The frozen spec is what every unit is checked against.
- Materials & board grades by moisture zone
- Dimensions & tolerances
- Finishes & colours — to the signed sample board
- Hardware & fittings
- M&E cut-outs & service positions
- Installation details & fixings
Once frozen, a change is a documented change — not a surprise on unit fifty. That is what makes a run repeatable, and what protects your programme and your budget.
Need the design and specification developed before you tender? ELS creates the design and specification — so your drawings, sample boards and BOQ are ready to price, prototype and repeat.
See it for your sector
The same process, one approved prototype at a time
Have a project to scope?
Send the brief. We'll prototype it before we scale it.
Share a drawing or a BOQ and we'll review it, sample it, prototype it and freeze the specification — then produce, install and hand over under ALUMAX specification, QC and warranty.