Home首页Laman UtamaFor Developers & Business / Production Process

Contract Production

Eleven controlled steps from brief to handover.

Bulk production only works when nothing is left to chance. This is exactly how a contract project runs at ALUMAX — from your brief and BOQ, through a real prototype you approve and a frozen specification, to batch QC, installation and handover.

Request Project ReviewSend BOQ / Drawings

Why the process matters

Nothing goes to bulk production until you've approved a real prototype.

A developer can't commit to hundreds of units on a drawing. So we prove the product first — a sample board and a real prototype you approve — then freeze the specification. Only then does anything go to scale. Every step exists to protect that.

The contract production workflow

From one brief to an entire development — eleven steps

Phase ASpecify
  1. 01

    Brief / BOQ

    You send drawings, a bill of quantities or a written brief — whatever you have. Nothing is required to start the conversation.

    You + your team
  2. 02

    Technical review

    We check the brief against what can actually be built — materials, sizes, moisture zones, buildability and any gaps in the drawings.

    ALUMAX + ELS
  3. 03

    Value engineering

    Where a material or detail can be simplified without losing performance, we propose it — so the specification is right for the budget before anyone commits.

    ALUMAX + ELS
Phase BProve & approveApproval gate
  1. 04

    Sample board

    Physical finishes, colours and hardware — confirmed against real samples, not a screen. The signed board becomes the reference for the whole project.

    ALUMAX
  2. 05

    Prototype / mock-up

    We build one real unit — a kitchen, a guest room, a workstation — to the reviewed specification, so you can see and test the actual product before scale.

    ALUMAX
  3. 06

    Client approval

    You inspect the prototype and sign it off. Nothing proceeds to bulk production until the real thing is approved — not a drawing of it.

    You
  4. 07

    Specification freeze

    Every material, size, finish, fitting and tolerance is locked to the approved prototype. The frozen specification is what every unit is measured against.

    Locked together
Approval gate — bulk production begins only after the prototype is approved and the specification frozen.
Phase CProduce生产
  1. 08

    Bulk production

    The frozen specification is routed to the right production — FLYHOME for standardized cabinetry, selected specialist partners for made-to-spec — and produced at volume.

    ALUMAX production network
  2. 09

    Batch QC

    Quality is checked across the batch against the frozen specification — not one sign-off at the end — so the last unit matches the approved prototype.

    ALUMAX
Phase DDeliver
  1. 10

    Delivery / installation

    Delivered in phases to your site programme and installed the same way in every unit, coordinated with your build sequence.

    ALUMAX
  2. 11

    Handover

    Checked per unit and handed over clean, with one accountable supplier behind the product warranty for the whole package.

    ALUMAX → You

What the specification freeze locks

The frozen spec is what every unit is checked against.

  • Materials & board grades by moisture zone
  • Dimensions & tolerances
  • Finishes & colours — to the signed sample board
  • Hardware & fittings
  • M&E cut-outs & service positions
  • Installation details & fixings

Once frozen, a change is a documented change — not a surprise on unit fifty. That is what makes a run repeatable, and what protects your programme and your budget.

Before you tender

Need the design and specification developed before you tender? ELS by ALUMAX creates the design and specification — so your drawings, sample boards and BOQ are ready to price, prototype and repeat.

Use ELS Design + Specification

Have a project to scope?

Send the brief. We'll prototype it before we scale it.

Share a drawing or a BOQ and we'll review it, sample it, prototype it and freeze the specification — then produce, install and hand over under ALUMAX specification, QC and warranty.

Back to ALUMAX Contract

Get My Price获取我的价格Dapatkan Harga Saya